« I had a dream | Main | ssss »

olympic multitasking

I am not a knitter who has one, two, many knittings at the same time. I am the concentrate-on-one-and-be-content-when-or-if-you-finish-it type. So now I am getting pretty nervous: there are three things waiting for finishing:
1. the mindles knitting
2.the amy butler dress
AND ...
3. I joined the skp group

010l
But multitasking will be the ultimate olympic challenge for me.
The skp challenge is that you must knit 5 pair of socks in 1 year. The first pair must be finished end of april. Piece of cake.
But the ultimate challenge for me will be the multi tasking.

For the 5 pair of socks I came up with the following idea (not the most original, but he? Has anyone else done it yet?)
5 pair of socks - 5 olympic rings - 5 colours

Got it?

Well, lets start with the colour blue:

Img_0908

Comments

Succes. Ik vind het altijd wel leuk om het breiwerk te kunnen pakken dat bij mijn stemming past.

Ik weet eigenlijk niet wat er bedoeld wordt met multi-tasking. Moet je volgens een bepaald thema 5 paar sokken breien?

In ieder geval veel succes.

@hannah: multi-tasking wil zeggen dat je verschillende dingen tegelijkertijd doet. Zoals in mijn geval: 2 paar sokken breien en 1 jurk maken. De bedoeling van skp2008 is dat je 5 paar sokken breit in een jaar volgens een patroon dat zij opgeven gedurende een vastgestelde periode. Dit paar moet eind april klaar zijn, dan wordt het volgende patroon gegeven.

Post a comment

If you have a TypeKey or TypePad account, please Sign In